在线咨询
eetop公众号 创芯大讲堂 创芯人才网
切换到宽版

EETOP 创芯网论坛 (原名:电子顶级开发网)

手机号码,快捷登录

手机号码,快捷登录

找回密码

  登录   注册  

快捷导航
搜帖子
查看: 13231|回复: 6

[讨论] PT里用PBA模式报timing,pba_mode中path和exhaustive的区别?

[复制链接]
发表于 2018-8-16 16:40:14 | 显示全部楼层 |阅读模式

马上注册,结交更多好友,享用更多功能,让你轻松玩转社区。

您需要 登录 才可以下载或查看,没有账号?注册

x
在PT里report_timing -pba_mode 的option有path和exhaustive两个,解释如下:
-pba_mode none | path | exhaustive
              Controls path-based analysis with the following modes:


              o none (the default) - Path-based analysis is not applied.
              o path - Path-based analysis is applied to paths after they have
                been gathered.
              o  exhaustive  -  An  exhaustive path-based analysis path search
                algorithm is applied to determine the worst path-based  analy-
                sis  path set in the design. If you use exhaustive, you cannot
                use the -start_end_pair or path_collection options.
这个path和exhaustive有什么区别?难道不都是用真实的arc进行计算delay吗?
发表于 2018-8-17 10:07:05 | 显示全部楼层
搭车同问
 楼主| 发表于 2018-9-4 14:47:06 | 显示全部楼层
已经理解了什么意思了,已解决!
发表于 2018-9-4 16:17:22 | 显示全部楼层
回复 3# SpunkyGG


   可以大概解释下吗?
发表于 2018-9-4 19:29:24 | 显示全部楼层
path偏乐观。exhaustive是准确的,前提是pt版本在2016以上,并开启无穷条路径的黑科技算法。
 楼主| 发表于 2018-9-5 08:56:26 | 显示全部楼层
回复 4# xingyun666666


   你去分别用一下这两个option,你会发现什么意思的,相信我
发表于 2021-12-9 10:08:29 | 显示全部楼层
面试被问到了这个问题,现在才知道
https://blog.csdn.net/Tao_ZT/article/details/102456820
您需要登录后才可以回帖 登录 | 注册

本版积分规则

关闭

站长推荐 上一条 /2 下一条


小黑屋| 手机版| 关于我们| 联系我们| 在线咨询| 隐私声明| EETOP 创芯网
( 京ICP备:10050787号 京公网安备:11010502037710 )

GMT+8, 2024-11-22 06:17 , Processed in 0.017897 second(s), 6 queries , Gzip On, Redis On.

eetop公众号 创芯大讲堂 创芯人才网
快速回复 返回顶部 返回列表