在线咨询
eetop公众号 创芯大讲堂 创芯人才网
切换到宽版

EETOP 创芯网论坛 (原名:电子顶级开发网)

手机号码,快捷登录

手机号码,快捷登录

找回密码

  登录   注册  

快捷导航
搜帖子
查看: 6342|回复: 10

ETAP 2023 Version 22.5 with Complete Features

[复制链接]
发表于 2023-9-11 03:40:19 | 显示全部楼层 |阅读模式

马上注册,结交更多好友,享用更多功能,让你轻松玩转社区。

您需要 登录 才可以下载或查看,没有账号?注册

x
本帖最后由 MarcelMan 于 2023-9-11 04:00 编辑

ETAP 2023 Version 22.5 with Complete Features

New Features
e Label Maker
• Graphical tool for creating Arc Flash Label templates
• Create modern Arc Flash Labels
• Include QR codes
• Generate localized labels



LIGHTNING RISK ASSESSMENT
• Identify & assess risks for a structure due to lightning flashes
• Comply with NFPA 780-2014 for lightning protection systems
• Reference lightning density / frequency maps
• Occupancy & protection assessment
• Catalog of predefined structure



Grid Code
Conform & Maintain Compliance
• Automated Grid Code Evaluation - Analyze & Verify
• Real & reactive power capability
• LV & HV ride-through
• Frequency ride-through
• Dynamic voltage & frequency support
• Country & Utility Grid Code Rulebooks
• User-definable
• PQ & VQ Capability
• Equipment voltage-dependent PQ Capability
• Equipment control including voltage & frequency drop
• Ride-through curves
• Country Codes
• ENA EREC G99 2021 (UK)
• ENA EREC G5/5 2020 (UK)
• IEEE 1547 2018
• PRC-024-2 (North America)
• Enedis-PRO-RES_64 2020 (France)
• RTE DTR 2020 (France)
• Guida Tecnica - Allegato A.68 - Rev.03 12/2019 (Italy)
• Guida Tecnica - Allegato A.17 - Rev.02 12/2019 (Italy)


SMART INVERTERS
• Autonomous, logic-driven decision making
• Multiple modes of operation & control
• Volt – Var
• Volt – Watt
• Watt – Power Factor
• Control curves or static var support
• Real or reactive power priority modes
• Consider smart inverter constraints
• Maintain compliance per IEEE 1547 & California Rule 21


ACTIVE HARMONIC FILTER
• Active Filter Harmonic Correction – Automatic & Manual
• Filter Sizing
• Unbalanced Correction
• Unbalanced Harmonic Load Flow & Compliance



UNBALANCED NETWORK SHORT CIRCUIT ANALYSIS
Unbalanced Network Short Circuit Analysis International Standards:
• IEEE Standard – C37 Series
• IEC Standard – IEC-60909, IEC-61660 & IEC/IEEE 62271-37-013
• GOST Standard - GOST R 52735 & GOST 28249
Unsymmetrical 3-phase & 1-phase AC System and Unified AC & DC System Modeling
• Phase domain representation of 3-phase & 1-phase systems
• Modeling of unsymmetrical 3-phase lines & cables, etc.
• Modeling of coupled 3-phase and 1-phase lines
• Modeling of special distribution transformers (open-delta, Scott-T & booster XFMRs, etc.)
• Unified AC & DC systems combined with rectifiers/converters
• Analysis of a fault in DC system automatically includes effect of AC system components and vice versa
Short Circuit Simulation for Shunt Fault Types
• Fault types - 3Ph, 3PhG, LG, LL, LLG
• Fault phases – ABC, ABCG, AG, BG, CG, AB, BC, CA, ABG, BCG, CAG
• Simultaneous shunt faults of different fault types & phases at different locations
Short Circuit Simulation on GIS System
• Fault calculations on user-specified shared buses
• Fault calculations along user-specified feeders
• Feeder fault calculation on all junction points or multi-connection junction points
• Device evaluation for protective devices in GIS systems, including those specified in edge editors
AC & DC Device Duty Evaluation
• ANSI/IEC AC device duty evaluation based on all fault types - 3-phase, LG, LL, & LLG
• ANSI/IEC AC device duty evaluation based on all available fault phases
• IEC-61660 DC device duty evaluation considering rise-time constant and peak or quasi steady-state current
• ANSI DC device duty evaluation based on user-specified worst case modeling
ANSI & IEC Standard AC Short Circuit Analysis
• Complying with latest version of ANSI & IEC standards
• Simulation of all possible types and phases of shunt faults
• Simulation of single shunt or simultaneous shunt faults of different fault type & phase and at different locations
• Device duty evaluation and alerts based on all fault types and phases
GOST Standard AC Short Circuit Analysis
• Complying with GOST R 52735 (AC HV) & GOST 28249 (AC LV)
• Adjust cable resistance due to fault current
• Induce effect of arc resistance at fault location
• Consider contact resistance and relay coil impedance in LV system calculations
• Options for AC decay of synchronous and induction machines
• Generate fault current waveforms with respect to time
DC System Short Circuit Analysis per IEC-61660
• Calculate total fault current and individual contributions
• Fault calculations include peak, quasi steady-state current, time to peak and rise-time constant



Flicker Meter
• Instantaneous, short-term (PST) & long-term (PLT) flicker indices
• Electromagnetic compatibility (EMC) based on IEC 61000-4-15
• Signal processing capability
• COMTRADE/CSV input
• Analyze multiple simultaneous signals
• Capable of processing up to 500 million data points



UNBALANCED HARMONICS
• Harmonic Load Flow with unbalanced loading conditions
• Harmonic compliance with IEEE/IEC limits
• Mitigation & unbalanced system correction using Active Harmonic Filters



For more information about ETAP 2023 Version 22.5, please contact fast.forever24@gmail.com


ETAP 22.5.png
发表于 2023-9-11 06:01:57 | 显示全部楼层
thanks
发表于 2023-9-11 07:48:26 | 显示全部楼层
多谢分享。。
发表于 2023-9-11 08:56:00 | 显示全部楼层
感谢分享
发表于 2023-10-14 09:56:33 | 显示全部楼层
ETAP 2023 Version 22.5 with Complete Features
发表于 2023-10-16 10:02:33 | 显示全部楼层
我想要
发表于 2023-10-22 12:15:43 | 显示全部楼层
联系8020169@qq.com     
给用户测试,完美
发表于 2024-6-23 19:00:42 | 显示全部楼层
感谢
发表于 2024-12-29 19:12:36 | 显示全部楼层
请问, 怎么下载 啊 ?
发表于 2024-12-29 23:50:15 | 显示全部楼层
thanks
您需要登录后才可以回帖 登录 | 注册

本版积分规则

关闭

站长推荐 上一条 /1 下一条

小黑屋| 手机版| 关于我们| 联系我们| 隐私声明| EETOP 创芯网
( 京ICP备:10050787号 京公网安备:11010502037710 )

GMT+8, 2025-5-23 02:07 , Processed in 0.038765 second(s), 9 queries , Gzip On, MemCached On.

eetop公众号 创芯大讲堂 创芯人才网
快速回复 返回顶部 返回列表