读PT文档关于
timing_early_launch_at_borrowing_latches的说明中有一段话,没看懂,大侠给指点一二

Since CRPR is a more sophisticated and accurate
means
of
pessimism
removal,
the
user
should
disable
timing_early_launch_at_borrowing_latches when CRPR is enabled so that CRPR applies to all paths in the design. In this mode, note that
the
D-pin
launch
time
is
not modified by the open edge CRP - since late launch

latency is used at the path startpoint, to additionally add
CRP
would

be
pessimistic, representing a "double-counting" of early-late differ
ences.


就是说CRPR方式比较好比较准确,使用的时候要关闭timing_early_launch_at_borrowing_latches,保证所有path都照顾到。从 In this mode后面就没看懂,什么叫open edge CRP ?怎么就算两次计入了呢?


 楼主| 发表于 2012-8-23 21:23:02 | 显示全部楼层
不知道为啥,排版拍好了,发出的帖子又变了,大家都包含,凑合看!
发表于 2012-8-23 22:28:58 | 显示全部楼层
大概的意思是说,在用CRPR时,要关掉timing_early_launch_at_borrowing_latches
因为当信号提前到达latch时,它会直接传给下一级,不用等clock edge的到来,等同于这个latch是透明的,
所以就不需要计算这个latch的OCV,也不需要计算它上面的CRPR了。
如果不这样的话,这个latch作为上一级的endpoint和下一级的startpoint,clock path的delay会被derate为不同的数值,太悲观了
发表于 2012-8-23 22:29:28 | 显示全部楼层
大概的意思是说,在用CRPR时,要关掉timing_early_launch_at_borrowing_latches
因为当信号提前到达latch时,它会直接传给下一级,不用等clock edge的到来,等同于这个latch是透明的,
所以就不需要计算这个latch的OCV,也不需要计算它上面的CRPR了。
如果不这样的话,这个latch作为上一级的endpoint和下一级的startpoint,clock path的delay会被derate为不同的数值,太悲观了
发表于 2013-4-14 20:32:26 | 显示全部楼层
学习了
发表于 2014-8-25 20:15:11 | 显示全部楼层
学习了!
发表于 2014-8-26 10:55:46 | 显示全部楼层
学习了!
发表于 2015-8-3 16:10:23 | 显示全部楼层
学习了!
发表于 2015-8-4 23:06:45 | 显示全部楼层
学习了!
发表于 2019-11-1 13:41:30 | 显示全部楼层
受教
您需要登录后才可以回帖 登录 | 注册

本版积分规则

关闭

站长推荐 上一条 /1 下一条

×

小黑屋| 关于我们| 联系我们| 在线咨询| 隐私声明| EETOP 创芯网
( 京ICP备:10050787号 京公网安备:11010502037710 )

GMT+8, 2024-3-29 04:57 , Processed in 0.031625 second(s), 9 queries , Gzip On, Redis On.

eetop公众号 创芯大讲堂 创芯人才网
快速回复 返回顶部 返回列表